TABLE OF CONTENTS
Construction Activities
undertaken during the Reporting Month
Statues of Environmental
Licensing and Permitting
Monitoring Parameters,
Frequency and Duration
Monitoring Methodology and
QA/QC Procedure
Monitoring Parameters,
Frequency and Duration
Monitoring Methodology and
QA/QC Procedure
Implementation Status of
Environmental Mitigation Measures
Implementation Status of
Event and Action Plans
Summary of Complaint,
Warning, Notification of any Summons and Successful Prosecution
Monitoring Schedule for
Next Month
lIST OF TABLES
Table I............... Summary of Complaint/Summons/Prosecution in
the Reporting Month
Table
1.1............ Key Project Contacts
Table
1.2............ Summary of Environmental Licensing and
Permit Status
Table
2.1 ........... Locations for Air Quality Monitoring
Table
2.2 ........... Air Quality Monitoring Equipment
Table
2.3 ........... Impact Dust Monitoring Parameters,
Frequency and Duration
Table
3.1 ........... Noise Monitoring Stations
Table
3.2 ........... Noise Monitoring Equipment
Table
3.3 ........... Noise Monitoring Parameters, Frequency and
Duration
Table
3.4 ........... Baseline Noise Level and Noise Limit Level
for Monitoring Stations
Table
4.1............ Quantities of Waste Generated from the
Project
Table
6.1............ Observations and Recommendations of Site
Inspections
Table
6.2............ Status of Required Submission under
Environmental Permit
lIST OF FIGUREs
Figure 2 Project Organisation for
Environmental Monitoring and Audit
Figure 3 Location of Monitoring Station
lIST OF APPENDIces
Appendix A Action and Limit Levels for Air Quality and Noise
Appendix B Copies of Calibration Certificates
Appendix C Weather Information
Appendix D Environmental Monitoring Schedules
Appendix E 1-hour TSP Monitoring Results and Graphical Presentations
Appendix F 24-hour TSP Monitoring Results and Graphical Presentations
Appendix G Noise Monitoring Results and Graphical Presentations
Appendix H Summary of Exceedance
Appendix J Environmental Mitigation Implementation Schedule (EMIS)
Appendix L Summary of Waste Generation and Disposal Records
Appendix M Construction Programme
Introduction
1. This is the 8th Monthly Environmental Monitoring and Audit (EM&A) Report prepared by the Environmental Team (ET), Cinotech Consultants Ltd., for Contract No. HY/2019/13 “Central Kowloon Route – Buildings, Electrical and Mechanical Works”. This report summarized the monitoring results and audit findings of the EM&A programme under the issued EP No. EP-457/2013/D, and in accordance with the EM&A programme in Central Tunnel (Ho Man Tin Area) during the reporting period from 1st August 2024 – 31st August 2024.
2. The major site activities undertaken in the reporting month included:
l Sub-structure works.
l ABWF Works
l E&M Installation
Environmental
Monitoring Works
3. Environmental monitoring for the Project was performed in accordance with the EM&A Manual and the monitoring results were checked and reviewed. Joint weekly site inspections with the representative of ET, Engineer Representative and the Contractor for Contract No. HY/2019/13 were conducted on 6, 13, 20, & 27 August 2024, whereas joint site inspection with the representative of IEC was conducted on 20 August 2024. The implementation of the environmental mitigation measures, Event and Action Plans and environmental complaint handling procedures were also checked.
4.
A summary of the non-compliance (exceedance) during the reporting month (August 2024) and the investigation results and/or follow-up actions
is provided below:
Air Quality Monitoring
l No Action/Limit Level exceedance for 1-hour TSP was recorded.
l No Action/Limit Level exceedance for 24-hour TSP was recorded.
l
No Action Level exceedance for construction noise was recorded.
l No Limit Level exceedance for construction noise was recorded.
Landscape and Visual Monitoring
l No non-conformity for landscape and visual was recorded.
Complaint Handling, Prosecution and Public Engagement
5.
Summary of complaint/summons/prosecution in the
reporting month is tabulated in Table I.
Table I Summary of Complaint/Summons/Prosecution in the Reporting Month
Event |
Event Details |
Follow-up/ Remedial Actions |
Status/ Remarks |
|
Number |
Brief Description |
|||
Complaints
Received |
1 |
Sewage
leaked from the site
office into the storm drains
at Ho Man Tin site. |
The
U channel
was cleaned up and the broken channel was repaired. |
EPD
and the complainant have no further comment. |
Notification
of Summons and Prosecutions Received |
0 |
- |
- |
- |
Reporting Changes
6. There were no reporting changes during the reporting month.
Future Key Issues
7. The key works or activities will be anticipated in the coming two months are as follows:
l Sub-structure works.
l ABWF Works
l E&M Installation
1.2 The Environmental Impact Assessment Report for Central Kowloon Route – Design and Construction (Register No.: AEIAR-171/2013) was approved under the Environmental Impact Assessment Ordinance (EIAO) on 11 July 2013. An Environmental Permit (EP No.: EP- 457/2013) was issued on 9 August 2013. Variations of Environmental Permit (VEP) was subsequently applied and an EP (EP No. EP-457/2013/C) was issued on 16 January 2017. The latest EP (EP No. EP-457/2013/D) was issued by Environmental Protection Department (EPD) on 15 June 2021.
1.3 The construction of the CKR had been divided into different sections. This Contract No. HY/2019/13 – Central Kowloon Route – Buildings, Electrical and Mechanical Works (“The Project”) will include the architectural, civil and structural construction works of Yau Ma Tei Ventilation Building (YVB), Ho Man Tin Ventilation Building (HVB), Kai Tak Ventilation Building (KVB) and Central Kowloon Route Administration Building (ADB) for the CKR. The landscaping and electrical and mechanical (E&M) works within the building sites will be involved as well.
1.4
Cinotech Consultants Limited
was assigned as the Environmental Team (ET) to undertake the EM&A works for
the Project. The construction of this Contract was commenced on 12th
December 2020.
1.5 The construction work on the Ho Man Tin area under Contract no. HY/2018/08 Central Kowloon Route – Central Tunnel was completed on 31 December 2023. Contract no. HY/2019/13 Central Kowloon Route – Buildings, Electrical and Mechanical Works in Ho Man Tin area was then commenced on 1 January 2024 and took over the site of Ho Man Tin area.
1.6 The baseline report for environmental monitoring was used the same as the HY/2018/08 on the Ho Man Tin area. The baseline air quality and noise monitoring were conducted in January 2018. The baseline monitoring results are presented in the Approved Baseline Monitoring Reports in accordance with EP-457/2013/C Condition 3.3 under Contract no. HY/2014/09 Central Kowloon Route – Ho Man Tin Access Shaft.
1.7 This is the 8th Monthly EM&A Report which summarises the impact monitoring results and audit findings for the EM&A programme in Central Tunnel (Ho Man Tin Area) during the reporting period from 1st August 2024 – 31st August 2024. The Central Tunnel (Ho Man Tin Area) site layout plan for the Project is shown in Figure 1.
1.8 Different Parties with different levels of involvement in the project organization include:
l Project Proponent – Highways Department (HyD)
l Engineer Representative (ER) – Arup – Mott MacDonald Joint Venture (AMMJV)
l Environmental Team (ET) – Cinotech Consultants Limited (Cinotech)
l Independent Environmental Checker (IEC) – Environmental Resources Management – Hong Kong Limited (ERM)
l
Contractor – Gammon Construction Limited (GCL)
1.9 The key contacts of the Project are shown in Table 1.1.
Table 1.1 Key Project Contacts
Party |
Role |
Contact Person |
Phone No. |
AMMJV |
Engineer Representative |
Mr. Tommy Wong |
3695 0419 |
Cinotech |
Environmental Team |
Ms. Betty Choi |
2151 2072 |
ERM |
Independent Environmental Checker |
Ms. Mandy To |
2271 3113 |
GCL |
Contractor |
Mr. William Chan |
5408 3045 |
1.10 The Organizational Structure for Environmental Management is shown in Figure 2.
Construction Activities undertaken during the Reporting Month
1.11 The construction programme is presented in Appendix M.
1.12 The major site activities undertaken in the reporting month included:
l Sub-structure works.
l ABWF Works
l E&M Installation
1.13 The EM&A programme requires air quality monitoring, noise monitoring, landscape and visual monitoring, and environmental site audit. The EM&A requirements for each parameter are described in the following sections, including:
l Environmental requirements and mitigation measures, as recommended in the EM&A Manual under the EP.
Statues of Environmental Licensing and Permitting
1.15 All permits/licenses obtained for the Project are summarized in Table 1.2.
Table 1.2 Summary of Environmental Licensing and Permit Status
Permit / License No. |
Valid Period |
Status |
|
From |
To |
||
Environmental Permit (EP) |
|||
EP-457/2013/D |
15
Jun 2021 |
N/A |
Valid |
Notification of Construction Works under Air
Pollution Control Ordinance (APCO) |
|||
457345 |
19
Jun 2020 |
End
of Project |
Valid |
Billing Account for Construction Waste
Disposal |
|||
7037679 |
26
Jun 2020 |
N/A |
Valid |
Registration of Chemical Waste Producer –
Ho Man Tin |
|||
5213-236-G2347-61 |
28
Nov 2023 |
N/A |
Valid |
Wastewater Discharge Licence - Ho Man Tin |
|||
WT10002215-2023 |
2
Feb 2024 |
31
Jan 2029 |
Valid |
Construction Noise Permit - Ho Man Tin |
|||
GW-RE0218-24 |
1
Mar 2024 |
31
Aug 2024 |
Superseded by GW-RE0561-24 |
GW-RE0561-24 |
9 May 2024 |
29 Oct 2024 |
Valid |
Construction Noise Permit for Works at Ho
Man Tin (Special Case for concrete pump truck) |
|||
GW-RE0399-24 |
28
Mar 2024 |
27
Sep 2024 |
Valid |
2.1 According to EM&A Manual under the EP, 1-hour and 24-hour TSP monitoring were conducted to monitor the air quality for this Project. For regular impact monitoring, a sampling frequency of at least once in every six days at all of the monitoring stations for 24-hour TSP monitoring. For 1-hour TSP monitoring, the sampling frequency of at least three times in every six days shall be undertaken when the highest dust impact occurs. Appendix A shows the established Action/Limit Levels for the environmental monitoring works.
2.2 Only one designated monitoring station was selected for 1-hour and 24-hour TSP impact dust monitoring programme. Both dust monitoring was conducted at the designated monitoring station (M-A3).
2.3 Table 2.1 describes the air quality monitoring locations, which are also depicted in Figure 3.
Table 2.1 Locations for Air Quality Monitoring
Monitoring
Stations |
Locations |
Location of Measurement |
M-A3 |
S.K.H. Tsoi Kung Po Secondary School |
Rooftop (above 3/F) Area |
2.4 Table 2.2 summarizes the equipment used in the impact air monitoring programme. Copies of calibration certificates are attached in Appendix B.
Table 2.2 Air Quality Monitoring Equipment
Equipment |
Model and Make |
Serial No. |
Quantity |
Calibrator |
TISCH TE-5025A |
3864 |
1 |
1-hour
TSP Dust Meter |
Dust Monitor System OC-9200 |
OC20210316224101 |
1 |
High
Volume Sampler |
TE-5170 c/w of TSP sampling inlet |
2204 |
1 |
Wind
Anemometer |
C-OC-9200-wind |
OC20210316224101 |
1 |
Monitoring Parameters, Frequency and Duration
2.5 Table 2.3 summarizes the monitoring parameters and frequencies of impact dust monitoring for the whole construction period. The air quality monitoring schedule for the reporting month is shown in Appendix D.
Table 2.3 Impact Dust Monitoring Parameters, Frequency and Duration
Parameters |
Frequency |
1-hour
TSP |
Three times /
6 days |
24-hour
TSP |
Once / 6 days |
Monitoring Methodology and QA/QC Procedure
1-hour TSP Monitoring
Measuring Procedures
2.6 The measuring procedures of the 1-hour dust meters were in accordance with the Manufacturer’s Instruction Manual as follows: (OC-9200 Dust Monitoring System)
l The 1-hour dust meter is placed at least 1.3 meters above ground.
l Set POWER to “ON” and make sure that the battery level was not flash or in low level.
l Allow the instrument to stand for about 3 minutes and then the cap of the air sampling inlet has been released.
l Push the knob at MEASURE position.
l Set time/mode setting to [BG] by pushing the time setting switch. Then, start the background measurement by pushing the start/stop switch once. It will take 6 sec. to complete the background measurement.
l Push the time setting switch to change the time setting display to [MANUAL] at the bottom left of the liquid crystal display.
l Finally, push the start/stop switch to stop the measuring after 1 hour sampling.
l Information such as sampling date, time, count value and site condition were recorded during the monitoring period.
Maintenance/Calibration
2.7 The following maintenance/calibration was required for the direct dust meters:
l Check and calibrate the meter by HVS to check the validity and accuracy of the results measured by direct reading method at 2-month intervals throughout all stages of the air quality monitoring.
24-hour TSP Monitoring
Instrumentation
2.8 High volume (HVS) samplers (Model TE-5170), completed with appropriate sampling inlets, were employed for 24-hour TSP monitoring. The sampler was composed of a motor, a filter holder, a flow controller and a sampling inlet and its performance specification complied with that required by USEPA Standard Title 40, Code of Federation Regulations Chapter 1 (Part 50). Moreover, the HVS also met all the requirements in section 2.5 of the updated EM&A Manual.
2.9
The positioning of the HVS
samplers are as follows:
l A horizontal platform was provided with appropriate support to secure the samplers against gusty wind.
l No two samplers were placed less than 2 meters apart.
l The distance between the sampler and an obstacle, such as buildings, was at least twice the height that the obstacle protrudes above the sampler.
l A minimum of 2 meters of separation from walls, parapets and penthouses was required for rooftop samples.
l A minimum of 2 meters separation from any supporting structure, measured horizontally was required.
l No furnaces or incineration flues were nearby.
l Airflow around the sampler was unrestricted.
l The sampler was more than 20 meters from the drip line.
l Any wire fence and gate, to protect the sampler, should not cause any obstruction during monitoring.
Operating/analytical procedures for the operation of HVS
2.10
Operating/analytical procedures for the air quality monitoring are
highlighted as follows:
l Prior to the commencement of the dust sampling, the flow rate of the high volume sampler was properly set (between 1.1 m3/min. and 1.4 m3/min.) in accordance with the manufacturer’s instruction to within the range recommended in USEPA Standard Title 40, CFR Part 50.
l For TSP sampling, fiberglass filters have a collection efficiency of > 99% for particles of 0.3μm diameter were used.
l The power supply was checked to ensure the sampler worked properly. On sampling, the sampler was operated for 5 minutes to establish thermal equilibrium before placing any filter media at the designated air monitoring station.
l The filter holding frame was then removed by loosening the four nuts and a weighted and conditioned filter was carefully centred with the stamped number upwards, on a supporting screen.
l The filter was aligned on the screen so that the gasket formed an airtight seal on the outer edges of the filter. Then the filter holding frame was tightened to the filter holder with swing bolts. The applied pressure should be sufficient to avoid air leakage at the edges.
l The shelter lid was closed and secured with the aluminium strip.
l The timer was then programmed. Information was recorded on the record sheet, which included the starting time, the weather condition and the filter number (the initial weight of the filter paper can be found by using the filter number).
l After sampling, the filter was removed and sent to the HOKLAS laboratory (High Precision Chemical Testing Ltd.) for weighing. The elapsed time was also recorded.
l Before weighing, all filters were equilibrated in a conditioning environment for 24 hours.
l The conditioning environment temperature should be between 25°C and 30°C and not vary by more than ±3°C; the relative humidity (RH) should be < 50% and not vary by more than ±5%. A convenient working RH is 40%.
Maintenance/Calibration
2.11 The following maintenance/calibration was required for the HVS:
l The high-volume motors and their accessories were properly maintained. Appropriate maintenance such as routine motor brushes replacement and electrical wiring checking were made to ensure that the equipment and necessary power supply are in good working condition.
l High volume samplers were calibrated at bi-monthly intervals using TE-5025A Calibration Kit through\hout all stages of the air quality monitoring.
2.12 All 1-hour TSP monitoring was conducted as scheduled in the reporting month.
2.13 No Action/Limit Level exceedance of the 1-hour TSP monitoring was recorded.
2.14 All 24-hour TSP monitoring was conducted as scheduled in the reporting month.
2.15 No Action/Limit Level exceedance of the 24-hour TSP monitoring was recorded.
2.16 The weather information for the reporting month is summarized in Appendix C.
2.17 The monitoring data and graphical presentations of 1-hour and 24-hour TSP monitoring results are shown in Appendix E and Appendix F respectively.
2.18 No exceedance was recorded for the air quality monitoring. The summary of exceedance record in reporting month is shown in Appendix H.
2.19 Site audits were carried out on a weekly basis to monitor and audit the timely implementation of air quality mitigation measures within the site boundaries of this Project. The summary of site audits is shown in Table 6.1 of this report.
2.20 According to our field observations during the monitoring, the major dust source identified at the designated air quality monitoring stations are road traffic dust, exposed site area and open stockpiles, excavation works and site vehicle movements.
3.1 According to EM&A Manuals under the EP, construction noise monitoring was conducted to monitor the construction noise arising from the construction activities. The regular monitoring frequency for each monitoring station shall be on a weekly basis and conduct one set of measurements between 0700 and 1900 hours on normal weekdays. Appendix A shows the established Action and Limit Levels for the environmental monitoring works.
3.2 Only one designated monitoring station was selected for the noise monitoring programme. Noise monitoring was conducted at the designated monitoring station (M-N3).
3.3 Table 3.1 describes the noise monitoring locations, which are also depicted in Figure 3.
Table 3.1 Noise Monitoring Stations
Monitoring
Stations |
Locations |
Location of Measurement |
M-N3 |
S.K.H. Tsoi Kung Po Secondary School |
Rooftop (above 3/F) Area |
3.4 Table 3.2 summarizes the noise monitoring equipment. Copies of calibration certificates are provided in Appendix B.
Table 3.2 Noise Monitoring Equipment
Equipment |
Model and Make |
Serial No. |
Quantity |
Sound
Calibrator |
Hangzhou Aihua
Instruments Co., Ltd. AWA6021A |
1023253 |
1 |
Integrating
Sound Level Meter |
SVANTEK SVAN
979 |
27189 |
1 |
BSWA
Technology BSWA 308 |
570187, 580156 |
2 |
Monitoring Parameters, Frequency and Duration
3.5 Table 3.3 summarizes the monitoring parameters, frequency and total duration of monitoring. The noise monitoring schedule is shown in Appendix D.
Table 3.3 Noise Monitoring Parameters, Frequency and Duration
Monitoring
Stations |
Parameter |
Period |
Frequency |
Measurement |
M-N3 |
L10(30
min.) dB(A) L90(30
min.) dB(A) Leq(30
min.) dB(A) |
0700-1900 hrs
on normal weekdays |
Once per week |
Façade |
Monitoring Methodology and QA/QC Procedure
3.6 The procedures for noise monitoring were as follows:
l The Sound Level Meter was set on a tripod at a height of 1.2 m above the ground.
l The battery condition was checked to ensure the correct functioning of the meter.
l Parameters such as frequency weighting, the time weighting and the measurement time were set as follows:
— frequency weighting : A
— time weighting : Fast
— time measurement : 30 minutes
l Prior to and after each noise measurement, the meter was calibrated using a Calibrator for 94.0 dB at 1000 Hz. If the difference in the calibration level before and after measurement was more than 1.0 dB, the measurement would be considered invalid and repeat of noise measurement would be required after re-calibration or repair of the equipment.
l The wind speed was frequently checked with the portable wind meter.
l At the end of the monitoring period, the Leq, L90 and L10 were recorded. In addition, site conditions and noise sources were recorded on a standard record sheet.
l Noise measurement was paused temporarily during periods of high intrusive noise if possible and observation was recorded when intrusive noise was not avoided.
l Noise monitoring was cancelled in the presence of fog, rain, and wind with a steady speed exceeding 5 m/s, or wind with gusts exceeding 10 m/s.
Maintenance and Calibration
3.7 The microphone head of the sound level meter and calibrator were cleaned with a soft cloth at quarterly intervals.
3.8 The sound level meter and calibrator were checked and calibrated at yearly intervals.
3.9 Immediately prior to and following each noise measurement the accuracy of the sound level meter shall be checked using an acoustic calibrator generating a known sound pressure level at a known frequency. Measurements may be accepted as valid only if the calibration levels from before and after the noise measurement agree to within 1.0 dB.
3.10 All construction noise monitoring was conducted as scheduled in the reporting month.
3.11 The Baseline Noise Level and the Noise Limit Level at the designated noise monitoring station are presented in Table 3.4.
Table 3.4 Baseline Noise Level and Noise Limit Level for Monitoring Stations
Monitoring Stations |
Baseline
Noise Level, dB (A) |
Noise Limit Level, dB (A) |
M-N3 |
67.7(1) (at 0700 – 1900 hrs on normal weekdays) |
70(*) (at 0700 – 1900 hrs on normal weekdays) |
(*) Noise Limit Level is 65 dB(A) during school
examination periods.
Note (1): The noise level due to the construction
work (CNL) was calculated by the following formula:
CNL = 10 log
(10MNL/10 – 10BNL/10)
Remarks: MNL =
Measured Noise Level, BNL = Baseline
Noise Level
3.12 No Action Level and Limit Level exceedance was recorded. The summary of exceedance record in reporting month is shown in Appendix H.
3.13 Noise monitoring results and graphical presentations are shown in Appendix G.
3.14
Site audits were carried out on a weekly basis to monitor and audit the
timely implementation of construction noise mitigation measures within the site
boundaries of this Project. The summary
of site audits are shown in Table 6.1 of this report.
3.15 According to our field observations during the monitoring, the major noise sources identified at the designated noise monitoring stations are road traffic noise, site vehicle movement, excavation works and daily school activities.
4.1
Waste generated from this
Project includes inert construction and demolition (C&D) materials and
non-inert C&D materials. Inert C&D waste includes soil, broken rock,
broken concrete and building debris, while non-inert C&D materials are made
up of C&D waste which cannot be reused or recycled and has to be disposed
of at the designated landfill sites.
4.2 The quantities of different types of waste generated in the reporting month are summarised in Table 4.1. Details of the amount of wastes generated by the major site activities of this Project during the reporting month is shown in Appendix L.
Table 4.1 Quantities of Waste Generated from the Project
Quantity |
|||||||
|
Inert C&D Materials |
Non-inert C&D Materials |
|||||
Reporting
Period |
Total
Quantity Generated (in
'000m3) |
Disposed
as Public
Fill (in '000m3) |
Others,
e.g. general
refuse (in '000m3) |
Metals (in
'000kg) |
Paper/cardboard Packaging (in
'000kg) |
Plastics (in
'000kg) |
Chemical
waste (in '000kg) |
August 2024 |
0.192 |
0.192 |
0.713 |
0 |
0 |
0 |
0 |
4.3
Site audits were carried out on
a weekly basis to monitor and audit to ensure that proper storage,
transportation, and disposal practices of waste materials generated during
construction activities, such as construction and demolition (C&D)
materials and general refuse are being implemented. The summary of site audits is
shown in Table 6.1 of this report. The implementation status of the waste/chemical management
measures in the reporting period are summarized in Appendix J.
5.1 According to the EM&A Manual, site audits would be undertaken during the construction phase of the Project to check that the proposed landscape and visual mitigation measures are properly implemented and maintained as per their intended objectives. Site inspections of the implementation of landscape and visual mitigation measures would be undertaken at least once every two weeks during the construction period.
5.2
Bi-weekly inspection of the
implementation of landscape and visual mitigation measures within the site
boundaries of this Project was conducted on 13 & 27 August
2024. The implementation status of the landscape and visual mitigation measures
in the reporting period are summarized in Appendix
J. The summary of observations and recommendations made for landscape and
visual mitigation measures during site audits are shown in Table 6.1 of this report.
5.3
No non-compliance of the
landscape and visual impact was recorded in the reporting month.
5.4
Should non-compliance of the landscape and visual impact occur, action
in accordance with the action plan presented in Appendix I shall be
performed.
6.1 Site audits were carried out on a weekly basis to monitor the timely implementation of proper environmental management practices and mitigation measures in the Project site.
6.2 Site audits for Contract No. HY/2019/13 were conducted on 6, 13, 20, & 27 August 2024 in the reporting month. Joint site inspection with the representative of IEC was conducted on 20 August 2024. No non-compliance was observed during the site audit.
Implementation Status of Environmental Mitigation Measures
6.3
According to Environmental
Permit, the approved EIA Report
(Register No.: AEIAR-171/2013), and the EM&A Manual
of the Project, the mitigation measures detailed in the documents are
recommended to be implemented during the construction phase. An Environmental Mitigation Implementation
Schedule (EMIS) is provided in Appendix
J.
6.4 The ET weekly site inspections were carried out during the reporting month and the observations and follow-up actions in Ho Man Tin Area are summarized in Table 6.1.
Table 6.1 Observations and Recommendations of Site Inspections
Parameters |
Date |
Observations |
Follow-up
Actions |
Water Quality |
20 August 2024 |
Ponding
water should be avoided. |
Ponding water has been removed. |
Air Quality |
N/A |
No
environmental deficiency was identified in the reporting period. |
N/A |
Noise |
N/A |
No
environmental deficiency was identified in the reporting period. |
N/A |
Waste / Chemical
Management |
20 August 2024 |
General
refuse should be avoided accumulation. |
General refuse has been
removed. |
Land
Contamination |
N/A |
No
environmental deficiency was identified in the reporting period. |
N/A |
Landscape and Visual |
N/A |
No
environmental deficiency was identified in the reporting period. |
N/A |
Permits /Licences |
N/A |
No
environmental deficiency was identified in the reporting period. |
N/A |
Implementation Status of Event and Action Plans
6.5 The Event Action Plans for air quality, noise and landscape and visual are presented in Appendix I.
Air Quality Monitoring
l No Action/Limit Level exceedance for 1-hour TSP was recorded.
l No Action/Limit Level exceedance for 24-hour TSP was recorded.
Noise Monitoring
l No Action Level exceedance for noise was recorded.
l No Limit Level exceedance for noise was recorded.
Landscape and Visual Monitoring
l No non-conformity for landscape and visual was recorded.
Summary of Complaint, Warning, Notification of any Summons and Successful Prosecution
6.6 One (1) environmental complaint was received in the reporting month regarding water leakage to the storm drains.
6.7 No warning, notifications of summons and successful prosecutions were received in the reporting month.
6.8 The summary of environmental complaint, warning, summon and notification of successful prosecution for the Project is presented in Appendix K.
6.9 Status of required submission under EP-457/2013/D during the reporting period are summarized in Table 6.2.
Table 6.2 Status of Required Submission under Environmental Permit
EP Condition (EP-457/2013/D) |
Submission |
Submission Date |
Condition
3.4 |
Monthly
EM&A Report (July
2024) |
14 August 2024 |
7.1 Major site activities undertaken for the coming two months include:
l Sub-structure works
l ABWF Works
l E&M Installation
7.2 Key environmental issues in the coming two months include:
l Stockpile accumulation on-site;
l Water spraying for dust generating activities and on haul road;
l Wastewater and runoff discharge from site;
l Coverage of open manholes to avoid dirty runoff to drainage system;
l Noise from operation of the equipment, especially for excavation works and machinery onsite;
l Accumulation of general refuse and construction waste on-site;
l Proper storage of construction materials on-site; and
l Storage of chemicals/fuel and chemical waste/waste oil on-site.
Monitoring Schedule for Next Month
7.3
The tentative environmental monitoring schedules for next month are
shown in Appendix D.
8.1 This is the 8th Monthly EM&A Report which presents the EM&A works undertaken in Ho Man Tin area during the reporting month from 1st August 2024 – 31st August 2024 in accordance with the EM&A Manual and the requirements under the EP.
Air Quality Monitoring
8.2
All 1-hr TSP monitoring was conducted as scheduled in the reporting
month.
8.3
No Action/Limit Level exceedance was recorded for all 1-hour TSP
monitoring in the reporting month.
8.4
All 24-hr TSP monitoring was conducted as scheduled in the reporting
month.
8.5
No Action/Limit Level exceedance was recorded for all 24-hour TSP
monitoring in the reporting month.
Construction Noise Monitoring
8.6
All construction noise monitoring was conducted as scheduled in the
reporting month.
8.7
No Action Level and Limit Level exceedance was recorded.
Landscape and visual
8.8 No non-compliance was recorded in the reporting month.
Site Audit
8.9
4 ET joint weekly environmental
site inspections were conducted in the reporting month. Joint weekly site inspections with the representative of ET,
Engineer Representative and the Contractor for Contract No. HY/2019/13 were
conducted on 6, 13, 20, &
27 August
2024, whereas joint site inspection with the representative of IEC was
conducted on 20 August
2024. All environmental deficiencies observed during site inspections were
rectified by the Contractor.
Complaint, Notification of Summons and Successful Prosecution
8.10
One (1) environmental complaint was received in
the reporting month regarding water leakage to the
storm drains. The Contractor has cleaned and repaired the U channel. No leakage
events have been observed at the reported location.
EPD and the complainant have no further comment.
8.11
No notifications of summons and successful
prosecutions were received in the reporting month.
I. Introduction
This is the 60th Monthly EM&A Report prepared by
Fugro Technical Services Limited for the Contract No. HY/2018/08 Central
Kowloon Route – Central Tunnel. The Contract No. HY/2018/08 commenced on 19
September 2019. This report summarized the monitoring results and audits
findings of the EM&A programme under the issued EP (EP No.: EP-457/2013/D)
and in accordance with the EM&A Manual during the reporting period from
01/08/2024 to 31/08/2024.
II. Summary of Main Works
Undertaken and Key Measures Implemented
The main construction works carried out in the reporting period were as
follow:
Yau
Ma Tei
· Plant and material lifting;
· Mucking out
from tunnel;
· Road slab and invert
slab construction;
· Cut and
cover construction;
· Noise enclosure and gantry
crane dismantlement.
Ma Tau
Kok
· Plant and
material lifting;
· Mucking out
from tunnel;
· OHVD slab corbel
waterproofing work;
· Cut and cover construction.
Kai Tak
Barging Point
· Material storage.
Sheung
Lok Street
· Site reinstatement work.
Ma Hang
Chung Road
· Site reinstatement work.
III. Summary of Exceedances,
Investigation and Follow-up
The last impact monitoring conducted by ET of Contract HY/2018/08 at
M-A3/ M-N3 was on 27 December 2023. Impact monitoring at M-A3/ M-N3 was
subsequently conducted by Environmental Team of Contract HY/2019/13 since
January 2024. The monitoring results at M-A3 and M-N3 are presented in the
monthly EM&A Report prepared by Contract No. HY/2019/13.
No Action and Limit Level exceedance was recorded for construction dust
monitoring in the reporting month.
No Action and Limit Level exceedance was recorded for construction noise
monitoring in the reporting month.
IV. Complaint Handling,
Prosecution and Public Engagement.
Two complaints were
received in the reporting month.
Two (2) water-related
complaints (i.e. 2nd August 2024) were received in the reporting month. One
complaint is under investigation and will be reported in the subsequent
reporting month.
The complaint cases in August 2024 are summarized in Table I.
Table I Environmental
Complaints Log
Complaint Log No. |
Date of Complaint |
Received From |
Nature of Complaint |
Status |
2 August 2024 |
Mobile message |
Water leakage from YMT
site |
Investigation report was
finalized on 5 September 2024. |
|
EC199_CKRCT20240802_799 |
2 August 2024 |
1823 |
Ponding of water next to
YMT site |
Under investigation and
the investigation results will be reported in the subsequent Monthly EM&A
Report. |
No notification of summons and prosecutions were received in the
reporting period.
No public engagement activities were conducted in the reporting period.
V. Reporting Change
There were no reporting changes during the reporting month.
VI. Future Key Issues
The main works will be anticipated in the next reporting period are as
follow:
Yau
Ma Tei
· Mucking out
from tunnel;
· Road slab and invert
slab construction;
· Noise
enclosure dismantlement;
· CLP Room removal.
Ma Tau
Kok
· Plant and
material lifting;
· Mucking out
from tunnel;
· OHVD slab corbel
waterproofing work;
· Cut and cover construction.
Kai Tak
Barging Point
· Material storage.
Sheung
Lok Street
· Site reinstatement work.
Ma Hang
Chung Road
· Site reinstatement work.
The recommended mitigation measures corresponding to the main works in
the next reporting period are listed as follow:
· Good relationship shall be
maintained with the nearby sensitive receivers/ stakeholders which may be
affected by the construction works such as providing better/ more detail
information of the work nature and inform in advance of the works to the nearby residents;
· Any excavated, stockpile of
dusty material or load of dusty materials on a vehicle leaving a construction
site should be covered entirely by impervious sheeting;
· All construction plants /
machineries should be checked / serviced on a regular basis during the courses
of construction to minimize the emission of noise generation and eliminate dark
smoke emission;
· All C&D materials
generated should be transported and stored at temporary storage area. Suitable
materials should be sorted for reuse on-site;
· Every vehicle shall be
cleaned thorough at the designated wheel washing area onsite;
· Wastewater generated from
drilling shall be properly collected for reuse or treated by wastewater
treatment facilities before discharge;
· Provision of drip trays for
equipment likely cause spillage of chemical / fuel, and provide
routine maintenance;
· Erecting temporary noise
barrier for noisy Powered Mechanical Equipment (PME) and deployment of Quality
Powered Mechanical Equipment (QPME) as many as practicable;
· Conditions in the
Environmental Permit and License should be followed;
· All recommended mitigation
measures specified in the approved EIA Report and EM&A Manual shall
be implemented;
· All vehicles should be
cleaned before leaving the construction site to ensure no muddy deposited by
them on roads.
The following EP submissions were submitted during the reporting month:
Table II Status of
Required Submission under Environmental Permit
EP Condition |
Submission |
Submission Date |
3.4 |
Monthly EM&A Report (July 2024) |
08 August 2024 |
Contents
1.3 Construction Programme and
Activities
1.4 Works undertaken during the month
1.5 Status of Environmental Licences,
Notification and Permits
2 ENVIRONMENTAL
MONITORING REQUIREMENTS
2.1 Construction
Dust and Noise Monitoring Locations
2.2 Construction
Dust Monitoring
2.3 Construction
Noise Monitoring
3 ENVIRONMENTAL
MONITORING RESULTS
3.1 Construction
Dust Monitoring
3.2 Construction
Noise Monitoring
5 ENVIRONMENTAL
COMPLAINT AND NON-COMPLIANCE
5.1 Complaint
Handling, Prosecution and Public Engagement
5.2 Summary of
Environmental Non-Compliance
5.3 Summary of
Monitoring Exceedance
8 CONCLUSION
AND RECOMMENDATIONS
Tables
Table I – Environmental Complaints Log
Table II – Status of Required Submission under Environmental Permit
Table 1.1 – Contact Information of Key Personnel
Table 1.2 – Environmental Licenses, Notification and Permits
Summary
Table 2.1 – Construction Dust and Noise Monitoring Location
Table 2.2 – Construction Noise Monitoring Parameters, Frequency and
Duration
Table 4.1 – Observations and Recommendation of Site Inspection in
the Reporting Period
Table 5.1 – Environmental Complaints Log
Table 6.1 – Status of Required Submission under Environmental
Permit
Figures
Figure 1 The Site
Layout Plan of the Contract
Figure 2.1 The
Location of the Construction Dust and Noise Monitoring Stations (Ho Man Tin)
Figure 2.2 The
Location of the Construction Dust and Noise Monitoring Stations (Ma Tau Kok)
Figure 2.3 The
Location of the Construction Dust and Noise Monitoring Stations (Yau Ma Tei)
Appendices
Appendix A Construction Programme
Appendix B Project Organization
Chart
Appendix C Event and Action Plan
Appendix D Implementation Status of
Environment Mitigation Measures (Construction Phase)
1.1.1 In order to meet the traffic
demand and relieve traffic congestion on the existing east-west roads across
Central Kowloon, Central Kowloon Route (CKR) (hereinafter referred to as “the
Project”) is proposed which is a 4.7 km long dual 3-lane trunk road in Central
Kowloon linking Yau Ma Tei Interchange in West Kowloon with the road
network on Kai Tak Development and Kowloon Bay in East Kowloon.
1.1.2 The Central Kowloon Route –
Design and Construction Environmental Impact Assessment Report (Register No.:
AEIAR-171/2013) was approved with conditions by the Environmental Protection
Department (EPD) on 11 July 2013. An Environmental Permit (EP-457/2013) was
issued on 9 August 2013. A variation of EP (VEP-594/2021) was applied on 26 May
2021 and the latest EP (EP-457/2013/D) was issued by EPD on 15 June 2021.
1.1.3 Contract No. HY/2018/08
Central Kowloon Route – Central Tunnel (hereinafter referred to as “the
Contract”), is one of the contracts of CKR which included the construction of
the central tunnel, cut-and-cover tunnels at Yau Ma Tei and Ma Tau
Kok and construction of piles and diaphragm walls for Ho Man Tin ventilation
building.
1.1.4 Fugro Technical Services Limited
(FTS) was appointed by Bouygues Travaux Publics (BTP) as the Environmental Team
(ET) under the Contract no. HY/2018/08 to execute the environmental monitoring
and audit (EM&A) programme under the issued EP (EP No.: EP-457/2013/D) and
in accordance with the EM&A Manual.
1.1.5 This is the 60th Monthly
EM&A Report prepared by FTS for the Contract No. HY/2018/08 Central Kowloon
Route – Central Tunnel. The Contract No. HY/2018/08 commenced on 19 September
2019. This report summarized the monitoring results and audits findings of the
EM&A programme under the issued EP (EP No.: EP-457/2013/D) and in
accordance with the EM&A Manual during the reporting period from 01/08/2024
to 31/08/2024.
1.2.1 The Project Organization
structure is shown in Appendix B. The key personnel contact names
and numbers are summarized in Table 1.1.
Table 1.1 Contact
Information of Key Personnel
Party |
Position |
Name |
Telephone |
Highways Department (HyD) |
E13/CKR |
Mr. Joe Lam |
2762 3380 |
Arup-Mott MacDonald Joint
Venture (AMMJV) |
Senior Resident Engineer |
Mr. Ben Poon |
3619 5967 |
ERM-Hong Kong, Limited
(ERM) |
Independent Environmental
Checker (IEC) |
Ms. Mandy To |
2271 3000 |
Bouygues Travaux Publics
(BTP) |
Environmental Manager |
Mr. Simon Wong |
9281 4346 |
Fugro Technical Services
Limited |
ET Leader |
Mr. Calvin Leung |
3565 4441 |
1.3 Construction
Programme and Activities
1.3.1 The construction phase of this
Contract under the EP commenced in October 2019. The site layout plan of the
Contract is shown in Figure 1.
1.3.2 The construction programme
of this Contract is shown in Appendix A.
1.4 Works
undertaken during the month
1.4.1 The main construction works
carried out in the reporting period were as follow:
Yau Ma Tei
· Plant and
material lifting;
· Mucking out
from tunnel;
· Road slab and invert
slab construction;
· Cut and cover construction;
· Noise enclosure and gantry
crane dismantlement.
Ma Tau
Kok
· Plant and
material lifting;
· Mucking out
from tunnel;
· OHVD slab corbel
waterproofing work;
· Cut and cover construction.
Kai Tak
Barging Point
· Material storage.
Sheung
Lok Street
· Site reinstatement work.
Ma Hang
Chung Road
· Site reinstatement work.
1.5 Status of
Environmental Licences, Notification and Permits
1.5.1 A summary of the relevant
permits, licenses and/or notifications on environmental protection for this
Contract is presented in Table 1.2.
Table 1.2 Environmental
Licenses, Notification and Permits Summary
Reference No |
Valid From |
Valid Till |
|
Form NB |
448930, 448970, 448971 |
Mid-Sep 2019 |
NA |
Billing Account for Disposal of C&D waste |
Account no. 7034790 |
06 Aug 2019 |
NA |
Chemical Waste Producer Registration (Ho Man Tin Construction site) |
5111-236-B2557-02 |
25 Sep 2019 |
NA |
Chemical Waste Producer Registration (Yau
Ma Tei Construction site) |
5213-225-B2557-05 |
19 Apr 2021 |
NA |
Chemical Waste Producer Registration (Ma Tau Kok Construction site) |
5213-247-B2557-06 |
19 Apr
2021 |
NA |
Construction Noise Permit |
|||
Construction
Noise Permit (Yau Ma Tei Construction site) |
GW-RE0602-24 |
17 May
2024 |
16 Nov
2024 |
Construction
Noise Permit (Yau Ma Tei Construction site) |
GW-RE0363-24 |
23 Mar
2024 |
22 Sep
2024 |
Construction
Noise Permit (Yau Ma Tei Construction site)1 |
GW-RE0944-24 |
12 Aug
2024 |
1 Sep
2024 |
Construction Noise Permit (Ma Tau Kok
Construction site) |
GW-RE0581-24 |
09 May
2024 |
08 Nov
2024 |
Construction Noise Permit (Ma Tau Kok
Construction site) |
GW-RE0171-24 |
18 Feb
2024 |
17 Aug
2024 |
Construction Noise Permit (Kai Tak Barging Point) |
GW-RE0457-24 |
17 Apr
2024 |
11 Oct 2024 |
Water Discharge License |
|||
Water Discharge License |
WT00035436-2019 (Portion
18) |
02 Apr 2020 |
30 Apr 2025 |
WT00037723-2021 (Yau
Ma Tei Construction site) |
07 Apr 2021 |
30 Apr 2026 |
|
WT00037883-2021 (Ma Tau Kok Construction
site) |
30 Apr 2021 |
30 Apr 2026 |
|
WT00042304-2022 (Sheung Lok Street) |
13 Oct 2022 |
31 Oct 2027 |
|
WT10001427-20233 (Ma Hang Chung Road) |
4 Dec 2023 |
31 Dec 2028 |
|
WT00041154-2022 (Kai Tak Barging
Facility) |
12 Jul 2022 |
31 Jul 2027 |
Note:
1. GW-RE0363-24 and
GW-RE0602-24 was superseded by GW-RE0944-24 since 12 August 2024.
2 ENVIRONMENTAL MONITORING REQUIREMENTS
2.1 Construction Dust and Noise Monitoring Locations
2.1.1 Three construction dust monitoring locations and five construction noise
monitoring locations pertinent to the Project have been identified based on the
approved EM&A Manual for the Project. The locations of the construction
dust and noise monitoring stations are summarized in Table 2.1 as
displayed in Figures 2.1 - 2.3.
Table 2.1 Construction
Dust and Noise Monitoring Locations
Dust Monitoring Station
ID |
Noise Monitoring Station
ID |
Monitoring Location |
M-A3 |
M-N3 |
SKH Tsoi Kung Po Secondary School |
/ |
E-N12a |
19 Hing Yan Street |
E-A14a |
E-N21a |
Block B of Merit Industrial Centre |
W-A6 |
/ |
Man Cheong building |
/ |
W-N18 |
Hydan Place |
/ |
W-N25A |
Prosperous Garden Block 1 |
Notes:
1. The dust and noise
monitoring stations proposed in the EM&A Manual for M-A6/ M-N6 (i.e. Ko Fai House,
Kwun Fai Court) was not available for impact dust and noise monitoring,
therefore impact monitoring was conducted at M-A3/ M-N3 as an alternative which
was agreed by the ER, IEC and EPD;
2. The noise monitoring
station proposed in the EM&A Manual for E-N12 (i.e. Grand Waterfront Tower
3) was not available for impact dust and noise monitoring, therefore impact
monitoring was conducted at E-N12a as an alternative which was agreed by the
ER, IEC and EPD;
3. The dust and noise
monitoring stations proposed in the EM&A Manual for E-A14 (i.e. Wyler
Gardens) and E-N21
(i.e Hang Chien Court Block J) was not available for impact dust and noise
monitoring, therefore impact monitoring was conducted at E-A14a/ E-N21a as an
alternative which was agreed by the ER, IEC and EPD;
4. The dust monitoring
stations proposed in the EM&A Manual for W-A5 (i.e. The Coronation) was not
available for impact dust monitoring, therefore impact monitoring was conducted
at W-A6 as an alternative which was agreed by the ER, IEC and EPD.
2.1.2 The last impact monitoring conducted by ET of Contract HY/2018/08 at
M-A3/ M-N3 was on 27 December 2023. Impact monitoring at M-A3/ M-N3 was
subsequently conducted by Environmental Team of Contract HY/2019/13 since
January 2024 (Figure 2.1).
2.1.3 The construction dust and
noise monitoring locations at M-A3 and M-N3 are covered by Contract No.
HY/2019/13 Central Kowloon Route – Buildings, Electrical and Mechanical Works.
The monitoring results at M-A3 and M-N3 are presented in the monthly EM&A
Report prepared by Contract No. HY/2019/13.
2.1.4 The construction dust and
noise monitoring locations at E-A14a, E-N12a and E-N21a are now covered by
Contract No. HY/2014/07 Central Kowloon Route – Kai Tak West. The monitoring
results at E-A14a, E-N12a and E-N21a in the reporting month are presented in
the monthly EM&A Report prepared by Contract No. HY/2014/07.
2.1.5 The construction dust and
noise monitoring locations at W-A6, W-N18 and W-N25A are now covered by
Contract No. HY/2014/08 Central Kowloon Route –Yau Ma Tei East. The
monitoring results at W-A6, W-N18 and W-N25A in the reporting month are presented
in the monthly EM&A Report prepared by Contract No. HY/2014/08.
2.2 Construction Dust Monitoring
Monitoring
Requirement
2.2.1 In accordance with the
approved EM&A Manual, 1-hour and 24-hour Total Suspended Particulates (TSP)
levels should be measured at the designated air quality monitoring stations to
indicate the impacts of construction dust on air quality. Regular Impact
24-hour TSP monitoring should be carried out for at least once every 6 days,
and 1-hour TSP monitoring should be done at least 3 times every 6 days when the
highest dust impact occurs.
Monitoring
Equipment
2.2.2 24-hour TSP air quality monitoring
was performed using High Volume Sampler (HVS) deployed at the designated
monitoring station. The HVS shall meet all the requirements of the EM&A
Manual.
2.2.3 A portable direct reading
dust meter was used to carry out the 1-hour TSP monitoring.
2.3 Construction Noise Monitoring
Monitoring
Requirement
2.3.1 In accordance with the
EM&A Manual, impact noise monitoring should be conducted at the designated
noise monitoring stations for at least once a week during the construction
phase of the Project. The parameters, frequency and duration of impact noise monitoring
is summarized in Table 2.2.
Table 2.2 Construction
Noise Monitoring Parameters, Frequency and Duration
Parameter |
Duration |
Frequency |
A-weighted equivalent continuous sound pressure level (Leq). L10 and
L90 were also recorded |
30 minutes |
At least once per week |
Monitoring
Equipment
2.3.2 Noise monitoring was performed
using sound level meter at the designated monitoring station. The sound level
meters deployed comply with the International Electrotechnical Commission
Publications 651:1979 (Type 1) and 804:1985 (Type 1) specifications. Acoustic
calibrator was deployed to check the sound level meters at a known sound
pressure level.
2.4.1 As per the EM&A Manual,
the landscape and visual mitigation measures shall be implemented and
site inspections should be undertaken once every two weeks during the
construction period. A summary of the implementation status is presented in Section
4.
3 ENVIRONMENTAL MONITORING RESULTS
3.1 Construction Dust Monitoring
3.1.1 The last impact monitoring conducted by ET of Contract HY/2018/08 was on
27 December 2023. Impact monitoring at M-A3 was subsequently conducted by
Environmental Team of Contract HY/2019/13 since January 2024. The monitoring
results at M-A3 and M-N3 are presented in the monthly EM&A Report prepared
by Contract No. HY/2019/13.
3.1.2 No Action and Limit Level
exceedance was recorded for construction dust monitoring in the reporting
month.
3.2 Construction Noise Monitoring
3.2.1 The last impact monitoring
conducted by ET of Contract HY/2018/08 was on 27 December 2023. Impact
monitoring at M-N3 was subsequently conducted by Environmental Team of Contract
HY/2019/13 since January 2024. The monitoring results at M-A3 and M-N3 are presented
in the monthly EM&A Report prepared by Contract No. HY/2019/13.
3.2.2 No Action and Limit Level
exceedance was recorded for construction noise monitoring in the reporting
month.
3.3.1 Auditing of waste management practices during regular site inspections
confirmed that the waste generated during construction were properly,
stored, handled and disposed of in general. The Contractor was
responsible for the implementation of any mitigation measures to reduce waste
or redress issues arising from the waste materials.
3.3.2 The implemented
environmental mitigation measures for the waste management in the reporting
period are summarized in Appendix D. The summary of observations
and recommendations made for waste management during the site inspections are
presented in Table 4.1.
3.3.3 Monthly summary of waste
flow table is detailed in Appendix F.
3.4.1 Bi-weekly inspections of
the implementation of landscape and visual mitigation measures were conducted
on 13 and 27 August 2024. The implementation the landscape and visual
mitigation measures in the reporting period are summarized in Appendix
D. The summary of observations and recommendations made for landscape and
visual mitigation measures during the site inspections are presented in Table
4.1.
3.4.2 The Event and Action Plan
for landscape and visual during construction phase is given in Appendix
C.
4 ENVIRONMENTAL SITE INSPECTION AND AUDIT
4.1.1 Site inspections were
carried out on a weekly basis to monitor the implementation of proper
environmental pollution control and mitigation measures for the Project. A
summary of the mitigation measures implementation status is provided in Appendix
D.
4.1.2 In the reporting month,
four site inspections were carried out on 6, 12 (with IEC), 20, and 27 August
2024. Details of observations recorded during the site inspections are
presented in Table 4.1.
Table 4.1 Observations
and Recommendation of Site Inspection in the Reporting Period
Environmental Aspect |
Date |
Observations, Reminders, and Recommendations |
Follow-up Actions |
Air Quality |
Nil |
Nil |
Nil |
Nil |
Nil |
Nil |
|
Noise |
Nil |
Nil |
Nil |
Water Quality |
27 August 2024 |
Drip tray should be provided for chemical containers. (MTK) |
Chemical containers were removed by Contractor. |
Waste Management |
Nil |
Nil |
Nil |
Landscape and Visual |
Nil |
Nil |
Nil |
Permit/ Licenses |
Nil |
Nil |
Nil |
5 ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE
5.1 Complaint Handling, Prosecution and Public Engagement
5.1.1 Two complaints were
received in the reporting month.
5.1.2 Two (2) water-related complaints
(i.e. 2nd August 2024) were received in the reporting month. One complaint is
under investigation and will be reported in the subsequent reporting month.
5.1.3 The complaint cases in
August 2024 are summarized in Table 5.1.
Table 5.1 Environmental
Complaints Log
Complaint Log No. |
Date of Complaint |
Received From |
Nature of Complaint |
Status |
EC198_CKRCT20240802_798 |
2 August 2024 |
Mobile message |
Water leakage from YMT
site |
Investigation report was
finalized on 5 September 2024. |
EC199_CKRCT20240802_799 |
2 August 2024 |
1823 |
Ponding of water next to
YMT site |
Under investigation and
the investigation results will be reported in the subsequent Monthly EM&A
Report. |
5.1.4 Cumulative complaint log,
summaries of complaints, notification of summons and successful prosecutions
are presented in Appendix E.
5.1.5 No public engagement
activities were conducted in the reporting period.
5.2 Summary of Environmental Non-Compliance
5.2.1 No environmental
non-compliance was recorded in the reporting period.
5.3 Summary of Monitoring Exceedance
5.3.1 The last impact monitoring
conducted by ET of Contract HY/2018/08 at M-A3/ M-N3 was on 27 December 2023.
Impact monitoring at M-A3/ M-N3 was subsequently conducted by Environmental
Team of Contract HY/2019/13 since January 2024. The
monitoring results at M-A3 and M-N3 are presented in the monthly EM&A
Report prepared by Contract No. HY/2019/13.
5.3.2 No Action and Limit Level
exceedance was recorded for construction dust monitoring in the reporting
month.
5.3.3 No Action and Limit Level
exceedance was recorded for construction noise monitoring in the reporting
month.
6 IMPLEMENTATION STATUS OF ENVIRONMENTAL
MITIGATION MEASURE
6.1.1 The Contractor had
implemented environmental mitigation measures and requirements as stated in the
EIA Report, the EP and EM&A Manual. The implementation status of the
environmental mitigation measures during the reporting period is summarized in Appendix
D. Status of required submissions under the EP during the reporting period
is summarised in Table 6.1.
Table 6.1 Status
of Required Submission under Environmental Permit
EP Condition |
Submission |
Submission Date |
3.4 |
Monthly EM&A Report (July 2024) |
08 August 2024 |
7.1.1 The main works will be anticipated
in the next reporting period are as follow:
Yau
Ma Tei
· Mucking out
from tunnel;
· Road slab and invert
slab construction;
· Noise
enclosure dismantlement;
· CLP Room removal.
Ma Tau
Kok
· Plant and
material lifting;
· Mucking out
from tunnel;
· OHVD slab corbel
waterproofing work;
· Cut and cover construction.
Kai Tak
Barging Point
· Material storage.
Sheung
Lok Street
· Site reinstatement work.
Ma Hang
Chung Road
· Site reinstatement work.
7.1.2 The recommended mitigation
measures corresponding to the main works in the next reporting period are
listed as follows:
· Good relationship shall be
maintained with the nearby sensitive receivers/ stakeholders which may be
affected by the construction works such as providing better/ more detail
information of the work nature and inform in advance of the works to the nearby residents;
· Any excavated, stockpile of
dusty material or load of dusty materials on a vehicle leaving a construction
site should be covered entirely by impervious sheeting;
· All construction plants /
machineries should be checked / serviced on a regular basis during the courses
of construction to minimize the emission of noise generation and eliminate dark
smoke emission;
· All C&D materials
generated should be transported and stored at temporary storage area. Suitable
materials should be sorted for reuse on-site;
· Every vehicle shall be
cleaned thorough at the designated wheel washing area onsite;
· Wastewater generated from
drilling shall be properly collected for reuse or treated by wastewater
treatment facilities before discharge;
· Provision of drip trays for
equipment likely cause spillage of chemical / fuel, and provide
routine maintenance;
· Erecting temporary noise
barrier for noisy Powered Mechanical Equipment (PME) and deployment of Quality
Powered Mechanical Equipment (QPME) as many as practicable;
· Conditions in the
Environmental Permit and License should be followed;
· All recommended mitigation
measures specified in the approved EIA Report and EM&A Manual shall
be implemented;
· All vehicles should be
cleaned before leaving the construction site to ensure no muddy deposited by
them on roads.
8 CONCLUSION AND RECOMMENDATIONS
8.1.1 The 60th Monthly
EM&A Report for the Contract No. HY/2018/08 Central Kowloon Route – Central
Tunnel summarized the monitoring results and audits findings of the EM&A
programme under the issued EP (EP No.: EP-457/2013/D) and in accordance with
the EM&A Manual during the reporting period from 01/08/2024 to 31/08/2024.
8.1.2 No construction noise monitoring was conducted in the reporting month as
the site had been handed over to Contract No. HY/2019/13 on 30 December 2023.
Impact monitoring at M-A3/ M-N3 has been conducted by Environmental Team
(HY/2019/13) since January 2024.
8.1.3 No Action and Limit Level
exceedance was recorded for construction noise monitoring in the reporting
month. No Action and Limit Level exceedance was recorded for construction dust
monitoring in the reporting month.
8.1.4 Weekly environmental site
inspections were conducted during the reporting period. In general, the
Contractor had implemented environmental mitigation measures and requirements
as stated in the EIA Report, the EP and EM&A Manual.
8.1.5 Two complaints were
received in the reporting month.
8.1.6 Two (2) water-related
complaints (i.e. 2nd August 2024) were received in the reporting month. One
complaint is under investigation and will be reported in the subsequent
reporting month.
8.1.7 No environmental related
prosecutions or notification of summons were received in the reporting period.
8.1.8 No environmental
non-compliance was recorded in the reporting period.
8.1.9 According to the
environmental site inspections performed in the reporting month, the following
recommendations were provided:
Air
Quality Impact
· No specific observation was
identified in the reporting month.
Construction
Noise Impact
· No specific observation was
identified in the reporting month.
Water
Quality Impact
· Drip tray should be
provided for chemical containers.
Waste
Management
· No specific observation was
identified in the reporting month.
Landscape
and Visual Impact
· No specific observation was
identified in the reporting month.
Permit/
Licenses
· No specific observation was
identified in the reporting month.